Our En Suite was looking a little second hand after 18 years. The original design included no tiles, a polished concrete floor and pained walls. After 18 years the walls had developed cracks and there was some water damage, how bad, we didn’t know when we started the works.

During

The polished concrete was also looking a little second hand and the hob around the spa needed replacing.

Our plan saw the hob being tiled, with the polished floor also being tiled over, after installing in floor heating. Due to water damage most of the shower walls were removed and rebuilt, and tiled in a vitrified marble slab.

We also splashed out on waterfall styled Italian marble tiles for around the spa. Plus a new hi tech fibre optic lighting system.

After